Downloadable Forms

Form NameDescription
Administrative AppealRequired to appeal a permit application decision by the Code Enforcement Officer
Accessory Cottage Growth PermitRequired for the construction of an accessory cottage (In conjunction with a building permit)
Building Permit Application - CommercialCommercial construction: New buildings, Additions, Renovations, etc.
Building Permit Application - ResidentialResidential construction: New homes, Additions, Renovations, etc.
Chimney and Fireplace ApplicationRequired for new chimney or fireplace installation or replacement of existing
Electrical Permit ApplicationRequired for all electrical work being performed: New service/upgrades, Wiring (includes low voltage cables), Alarm systems, Pools, etc.
Fill PermitRequired with the placement or removal of more than 15 yards of fill, more than 1,000 requires Planning Board approval
Final Inspection RequirementsList of major code requirements for a final inspection of a new home
Growth PermitRequired for the construction of a new home (In conjunction with a building permit)
Heating ApplianceRequired for the installation or complete replacement of any heating appliance
Home Occupation PermitRequired for any occupation located in a dwelling
Inspection Schedule FormIdentifies at which point an inspection is required
Outdoor Wood Fired Boiler

Outdoor installation of wood boiler application & permit

Phosphorus Control Permit

This permit application must be submitted with a phosphorus control and sedimentation and erosion control plan as per section 3.17.3.

Plot Plan SampleVisual example of what is expected on a submitted plot plan
Plumbing PermitRequired for any new or replacement fixtures or pipes.
Shoreland Zone permit trees onlyTree removal only - Three forms are provided for your use: Tree cutting & pruning, Non-Building activity, & General Permit for site development, Building expansion, etc.
Shoreland Zone PermitRequired for activity within the shoreland zone including construction, tree harvesting, and landscaping
Sign PermitRequired for the placement, replacement or location change of a sign
Sign Permit for Temporary Advertising SignTemporary Advertising Sign- Registration Form
Sprinkler System Installation Permit ApplicationRequired for the installation of a sprinkler system
Street Entrance ApplicationRequired for road access/driveway
Swimming Pool GuidelinesSwimming Pool Guidelines
Swimming Pool PermitRequired for any fixed, pool both above ground and inground
Woodstove ManualThis guide has been prepared to inform the people of the State of Maine of the recommended standards for the installation of wood burning stoves.
Woodstove PermitRequired for the installation of a woodstove
Variances, Conditional Uses & Appeals
Form NameDescription
Accessory Growth permitGROWTH PERMIT for accessory cottages
Conditional Use Application 6.2Additions to nonconforming dwellings or dwellings on nonconforming lots
Conditional Use Application 8.3Use for any conditional use allowance where a specific form is not listed here.
Conditional Use Application 6.9 & 6.10Tear down and rebuild
Disability VarianceA Variance due to a disability, Ramp etc.
Accessory Dwelling Unit.Accessory Dwelling Units; commonly called in-law apartments
Home OccupationUse when the home occupation requires either CEO approval or a public hearing with the Board of Zoning Appeals
Mislocated Single Family Dwelling AppealMislocated Single Family Dwelling that does not meet setbacks. See Section 8.2.1 of the zoning ordinance
Nonconforming Structures in a Shoreland ZoneThree forms are provided for your use: Tree cutting & pruning, Non-Building activity, & General Permit for site development. Buildingexpansion, etc.
Single Family Set Back Variance Request 8.5Zoning board application to permit the variance from a setback requirement for a single family dwelling
Transmission TowersConditional Use Application; See also Article 10 of the Town Code of Ordinances for Personal Wireless Service Facilities
Variance RequestZoning board application for a variance from, Height, lot size, lot coverage and setback
ZBA CalendarHearing & submittal deadline