June 2013 Ballot Question 1: Infrastructure Plan Information

Project Summary
This is a 1-page summary with some illustrations.


Frequently Asked Questions
This is a 3-page printable list of commonly-asked questions and answers about the project.


Before and After Street Views
These are three before-and-after views of Route One.


12-minute video presentation regarding the proposed plan narrated by Theo Holtwijk, Director of Long Range Planning, February 2013


Preliminary Site Plans, March 2013 (please zoom in to see the details of the plans):

All four maps in single file
Map 1: A Perfect Smile to Falmouth Physical Therapy
Map 2: People's United Bank to Clearwater Drive
Map 3: Clearwater Drive to Shops at Falmouth Village
Map 4: Falmouth Shopping Center to Foreside Tavern

Preliminary Plan Cost Estimate, as of March 18, 2013
The matrix prints best on 11 by 17 inch paper.